ASME B16.9 Stainless Steel 90° Elbow for Corrosive Process Lines
Available in grades 304 through 321, machined to standard B16.9 dimensions, and shipped with a mill-issued 3.1 test certificate on every batch.
Technical Specifications
Core Features & Advantages

This elbow is alloyed with chromium and nickel at a combined content above 20% (Feature). That composition forms a passive oxide layer on the bore surface, which resists pitting and crevice corrosion in chloride-bearing fluids far better than plain carbon steel (Advantage). In chemical transfer lines and coastal installations, this means fewer unplanned replacements and lower total piping cost across the service life of the line, even though the per-unit price runs higher than a carbon steel equivalent (Benefit).
Center-to-end dimensions and OD are held to ASME/ANSI B16.9 tolerances for NPS 2 fittings (Feature). Because the geometry is cross-checked against DIN/EN, JIS, and GOST tables during design, the elbow fits piping isometrics built around any of these four standards without field re-cutting (Advantage). Installation crews avoid re-measuring or re-ordering fittings mid-project when a line was specified to a non-ASME standard (Benefit).


Every batch ships with an EN 10204 3.1 Mill Test Certificate covering chemical composition and mechanical properties by heat number (Feature). That paper trail lets your QA team match a specific delivery back to its melt and test data instead of relying on a general compliance statement (Advantage). For projects that require SGS, BV, or TÜV sign-off before loading, that inspection can be arranged directly against the same heat records (Benefit).
Application Scenarios
Click a card to see the fit for that industry.
Transfer lines in this sector carry acids, solvents, and chloride-bearing process fluids that pit carbon steel within a few operating cycles. A 316/316L elbow in this bore size holds up under repeated CIP cycles and intermittent chemical exposure, and the EN 10204 3.1 certificate lets your plant engineer log the exact heat number into the piping isometric before commissioning.
OEM / ODM Service Process
Factory Strength & Certification

Elbow pushing line

Vertical lathe

Heat treatment furnace

10,000-ton hydraulic press
Equipment shown runs the pushing, machining, and heat-treatment stages behind this elbow. Full equipment list on the Produce Equipment page.
All three ISO certificates were issued Sep. 10, 2024 and are valid through Sep. 9, 2027, covering steel pipe and pipe fitting manufacturing. Full certificate scope on the Certificate page.
Quality Control Process

Every incoming heat is run through a desktop spectrometer to verify chromium, nickel, and molybdenum content against the ordered grade before it enters production.

Machined pieces are checked against B16.9 dimensional tables - OD, center-to-end, and wall thickness - using calipers and an ultrasonic thickness gauge.

Weld seams and bore surfaces are scanned with an ultrasonic flaw detector to catch subsurface porosity or inclusions before the elbow moves to the next stage.

Sample pieces from each batch go through hardness testing and a universal testing machine to confirm mechanical properties match the grade's mill spec.

Before packing, a final visual and dimensional pass is run against the packing list, and the EN 10204 3.1 certificate is matched to the physical batch.
Client Cases
MARINE & OFFSHORE · REFERENCE DELIVERY
Coastal Desalination Plant - Seawater Intake & Brine Return Lines
An EPC contractor building a seawater desalination train needed NPS 2 (DN50) 90° long-radius elbows for the intake, dosing, and brine-return skids, where chlorinated seawater rules out carbon steel. We supplied ASTM A403 WP316L elbows to ASME B16.9 in Schedule 40S, each batch released with an EN 10204 3.1 Mill Test Certificate, with SGS witness inspection carried out before container loading. Dimensional records were submitted with the MTC package so the site QA team could log heat numbers straight into the piping isometric during commissioning.
Logistics & After-Sales Support
Frequently Asked Questions
We stock 304, 304L, 316, 316L, and 321 for this size, plus duplex stainless steel on request for higher-chloride or higher-strength service. Grade selection affects lead time when a non-stocked chemistry is ordered in volume.
Dimensions follow ASME/ANSI B16.9. We cross-check the same fitting against DIN/EN, JIS, and GOST tables, so it fits piping systems designed to any of these four standards without re-fabrication.
MOQ is 1 piece. Standard lead time is 15 days after order confirmation and deposit receipt; peak-season or non-stocked grade orders can run up to 30 days depending on volume.
Yes. Every shipment carries a Mill Test Certificate under EN 10204 3.1 with chemical composition and mechanical test data. We also cooperate with third-party inspectors such as SGS, BV, or TÜV when a pre-shipment inspection is requested.
Both LR and SR fall within our production range for this size. Please specify which type your drawing calls for when placing the order; standard listings default to long radius (LR) per ASME B16.9.
Small items ship in wooden cases; larger volume orders go on wooden pallets. A 20GP container holds roughly 20 standard wooden cases (about 18–22 t total), and a 40HQ holds roughly 40 cases (about 26–28 t), depending on exact size mix.
NEXT STEP
Send Your Drawing - Get a Technical Proposal in 1–2 Working Days
Share your grade, radius type (LR/SR), wall-thickness schedule, and quantity. Our engineering team confirms feasibility against the production range, quotes against current material cost, and returns a full technical proposal - dimensional data and MTC scope included.
MOQ 1 piece · EN 10204 3.1 MTC with every shipment · SGS / BV / TÜV inspection on request
Request a Quotation View Certificates
Hot Tags: 2 inch stainless steel 90 degree elbow, China 2 inch stainless steel 90 degree elbow manufacturers, suppliers, factory, stainless steel elbow
